Electrical Contractors
Preventive maintenance for every panel, transformer, and switch
Commercial electrical maintenance contracts need scheduling, documentation, and compliance tracking. Stinger PM handles all of it.
Challenges electrical contractors face
Infrared scans and PM testing need scheduling
Annual thermographic surveys, breaker testing, transformer oil sampling — each on different cycles. Tracking it manually across 30 customer sites is unsustainable.
Arc flash and safety documentation matters
Regulatory requirements mean you need to document everything. NFPA 70B compliance requires records of every PM performed on electrical equipment.
Your best techs' knowledge walks out the door
When your senior electrician retires, 20 years of "that panel at the hospital trips every summer" knowledge goes with him. If it's not documented, it's gone.
How Stinger PM helps electrical contractors
Keep PM schedules organized, preserve institutional knowledge, and stay compliant — all at one flat price.
PM scheduling
Annual thermographic surveys, quarterly breaker exercising, transformer oil sampling, monthly generator load tests. Set frequency per asset, work orders auto-generate.
Asset history
Every panel, transformer, ATS, and generator with full service history. Your techs see what's been done, what's been found, and what to watch for. Institutional knowledge stays in the system.
Checklists
IR scan procedures, breaker test sequences, generator load bank test steps. Standardize your PM process across your entire team.
Custom fields
Track voltage, amperage ratings, arc flash labels, last IR scan date, oil sample results, manufacturer warranty dates — whatever's relevant to the equipment.
Multi-location
Organize by customer site. The data center has different needs than the retail strip. Each site's electrical assets tracked independently.
QR tags
Tag every panel and switchgear. Scan to see full maintenance history and start a new work order. The aluminum tags survive electrical rooms.
Stop paying per user
Here's what CMMS software costs for a 10-person electrical contractor team (1 service manager, 7 electricians, 1 estimator, 1 office):
| Solution | Monthly Cost (10 users) |
|---|---|
| Stinger PM | $250flat |
| UpKeep | $450 – $750 |
| Limble | $280 – $690 |
Add your entire team — electricians, estimators, office staff — without worrying about the bill.
Ready to preserve your team's knowledge?
Start your 30-day free trial today. No credit card required. See how Stinger PM helps electrical contractors manage PM contracts and keep institutional knowledge in the system.